Little's Law: WIP = throughput × lead time. On average, the work inside a process equals the rate work leaves it times the time each unit spends inside. A department holding 1,200 parts and shipping 150 a day has an 8-day lead time; to quote 3 days at the same output, it can hold no more than 450.

Solve for WIP, throughput or lead time

Fill in two of the three and leave the one you want blank. Fill in all three to check them against each other.

Time unit
units

Units inside the boundary

units / day

Average rate leaving it

days

Average time inside it

Lead time
8 days
from the other two
WIP
1,200 units
Throughput
150 a day
Lead time
8 days
Show the working
  1. Lead time = WIP ÷ throughput = 1,200 units ÷ 150 a day = 8 days.
  2. A unit that joins the queue now leaves, on average, 8 days later.

The Little's Law formula

WIP = throughput × lead time
Throughput = WIP ÷ lead time
Lead time = WIP ÷ throughput
One time unit for both: units a day with days, or units an hour with hours

The law, proved by John Little in 1961, holds for long-run averages of any stable system, whatever the mix of products, the order work is taken in, or how variable the process is. Stable means work leaves at about the rate it arrives, so WIP isn't steadily growing or shrinking over the period you measure.

All three figures have to describe the same boundary. If WIP is counted from the saw to the final wash, throughput is what leaves the wash, and lead time runs from joining the saw queue to leaving the wash. Count WIP in the same units as throughput (parts, orders or kits), and keep throughput and lead time on one clock: calendar days with calendar days, or working days with working days.

Fill in all three to check a set of figures against each other. If a lead time measured from order records disagrees with WIP ÷ throughput by more than about 10%, the boundaries or the periods probably don't match, or the system wasn't stable while you measured.

Worked example

A machining department counts its work in process on a Monday walk: 1,200 parts sitting in queues, on machines and waiting for inspection, from saw to final wash. Over the last eight weeks it shipped an average of 150 parts a working day, and its WIP count has stayed about level over that time. The plant wants to quote a three-day lead time.

  1. Lead time = WIP ÷ throughput = 1,200 units ÷ 150 a day = 8 days.
  2. A unit that joins the queue now leaves, on average, 8 days later.
  3. For a 3-day lead time: WIP = throughput × lead time = 150 a day × 3 days = 450 units.
  4. For a 3-day lead time: On average, 450 units are inside the boundary at any moment.

Why lead time follows WIP

Little's Law is why lean programs cap work in process. At a fixed throughput, lead time can only fall if WIP falls: a department that ships 150 parts a day and holds 1,200 has an 8-day lead time however hard people work. Adding capacity raises throughput, which shortens lead time only if WIP doesn't rise with it. Releasing work early to keep machines busy raises WIP and lengthens lead time without shipping a single extra part.

Compare the lead time with the work content. If each part gets 40 minutes of machining and handling during an 8-day lead time, it spends well under 1% of its time being worked on, and the rest in queues. That ratio, often called flow efficiency, is where lead-time reduction usually starts. A kanban loop or a WIP cap per area are the usual ways to hold WIP down.

Common mistakes

  • Mixing boundaries. WIP counted for one department with throughput for the whole plant gives a lead time for neither. Count all three inside the same boundary.
  • Using it while WIP is building or draining. During a ramp-up or while a backlog builds, arrivals and departures differ and the law doesn't hold for that stretch. Measure over a stable period, or one long enough that the WIP at the start and end are close.
  • Mixing clocks. Throughput per working day with lead time in calendar days is out by the ratio of the two. Pick one clock and use it for both.
  • Counting WIP in different units. Orders, parts and kits are different units. A WIP count in parts with throughput in orders gives a meaningless lead time unless every order is one part.
  • Trusting one WIP count. WIP counted on one Monday morning may be unusually high or low. Average several counts across the period.

Little's Law FAQ

What is Little's Law?

A relationship between three long-run averages of any stable system: the number of items in it (WIP), the rate items leave (throughput), and the time each item spends inside (lead time). WIP = throughput × lead time.

How do you calculate lead time from WIP?

Divide WIP by throughput. 1,200 parts in process ÷ 150 parts shipped a day = an 8-day lead time.

Does Little's Law work in manufacturing?

Yes, for long-run averages over a stable period, inside one boundary. It doesn't depend on the product mix, the scheduling rule or how variable the process is. It describes averages: single orders can take much longer or much less.

What units should I use?

Any, as long as they match: WIP and throughput in the same items, and throughput and lead time on the same clock. With throughput in parts per hour, lead time comes out in hours.

How can I reduce lead time?

At a fixed throughput, only by reducing WIP: release less work, cap queues, cut batch sizes. Raising throughput also shortens lead time, as long as WIP stays where it is.

Is anything I enter saved?

No. The calculator runs in your browser and nothing you type is sent to AutoOps AI or stored. There is no login.

See your own lines against their normal range.

On a plant account, upload a production export (.xlsx or .csv) and map its columns once. Plant today then compares each line's output, scrap and downtime with that line's own normal range, and every figure links to its source rows.