Takt time calculator
Takt time = available production time ÷ customer demand. It is how often one unit has to leave the line to meet demand. With two 8-hour shifts, 30 minutes of breaks per shift, 20 minutes of planned downtime, and 1,100 units a day, takt time is 48 seconds. Enter your own shifts and demand below.
Calculate takt time
Enter one day. Breaks are per shift; planned downtime is for the whole day.
8 hours = 480
Lunch and paid breaks
Meetings, planned maintenance, changeovers
Compare a station against takt
- Net available time
- 880 min · 52,800 s
- Required pace
- 75 units / hour
- Your cycle time vs takt
- 4 s over takt
At this cycle time the station can't keep up with demand. Rebalance the line to bring every station under takt.
Show the working
- Scheduled time: 2 × 480 min = 960 min.
- Net available time: 960 − 60 min of breaks − 20 min of planned downtime = 880 min, or 52,800 s.
- Takt time: 52,800 s ÷ 1,100 units = 48 s per unit, or 75 units an hour.
- Cycle time 52 s − takt 48 s = 4 s over takt. At that pace a station finishes 1,015 units in the available time, 85 short of demand.
The takt time formula
Keep both sides on the same period: a day's available time over a day's demand, or a week's over a week's. Convert to seconds so takt compares directly with the cycle times you time on the floor.
Worked example
A bracket assembly line runs 2 shifts of 480 minutes, with 30 minutes of breaks in each shift and a 20-minute start-up meeting each day. The customer schedule calls for 1,100 brackets a day.
- Scheduled time: 2 × 480 = 960 min.
- Less breaks (2 × 30 = 60 min) and planned downtime (20 min): 880 min, or 52,800 s.
- Takt time: 52,800 ÷ 1,100 = 48 seconds per bracket, or 75 brackets an hour.
- The torque station currently takes 52 s, which is 4 s over takt. At that pace it finishes 1,015 brackets a day, 85 short of demand, until the work is rebalanced.
Next: balance the line to takt
Takt tells you the time budget per station. To find how many stations you need and which tasks go where, use the line balancing calculator; it starts from the same 48-second takt.
Do this on your real data
Capacity Line, a beta tool in the AutoOps AI app, runs this same math from a spreadsheet. Fill in the workbook template (products and demand, operations with cycle times and predecessors, resources, and your shift calendar), upload it, and it calculates takt per product, a proposed station balance, minimum stations, balance efficiency, resource load and utilization, and the bottleneck. You can save scenarios, compare two side by side, and export to PDF or Excel. It is included on the Pro plan and in plant workspaces where an admin has turned it on.
Download the Capacity Line workbook template (.xlsx) to see the fields it needs.
Common mistakes
- Taking unplanned downtime out of available time. Takt is the customer's pace, so it only loses the time the line is scheduled not to run. Subtracting expected breakdowns makes takt shorter than demand requires and hides the loss inside the target. Keep breakdowns as a loss, and plan cycle times below takt to absorb them.
- Mixing periods. A week's demand over one day's available time, or a month's orders over a single shift pattern, gives a number that looks precise and means nothing. Put the same period on both sides of the division.
- Running every station exactly at takt. A line where every station needs the full takt has no room for a slow cycle, a short stop or a changeover overrun, so it falls behind on the first one. Balancing to a cycle time somewhat below takt leaves that room.
- Forgetting scrap. If some units are scrapped, the line has to start more than the customer orders. Divide demand by the share of units that come out good before you calculate takt, or the line will hit its pace and still ship short.
Takt time FAQ
What is takt time?
Takt time is the pace a line has to keep to meet customer demand: the available production time divided by the number of units the customer needs in that time. If you have 52,800 seconds of production time a day and need 1,100 units, one unit has to come off the line every 48 seconds.
How do you calculate takt time?
Takt time = net available production time ÷ customer demand. Net available time is the scheduled shift time minus breaks and planned downtime, for the same period as the demand. Use seconds for the answer so it compares directly with cycle times.
What is the difference between takt time and cycle time?
Takt time is set by demand: how often a unit is needed. Cycle time is set by the process: how long a station or operator actually takes per unit. A station whose cycle time is longer than takt cannot keep up, and the line falls behind demand.
Should I subtract breaks and planned downtime?
Yes. Subtract anything scheduled in which the line does not run: breaks, lunch, start-of-shift meetings, planned maintenance, and planned changeovers. Do not subtract unplanned downtime. That is a loss the line has to absorb, which is why the cycle time you run at is usually set below takt.
What if my cycle time is longer than takt time?
The line cannot meet demand at that pace. The usual options are to move work off the slow station (rebalance), add a parallel station or another operator, cut the work content of the task, or add available time with overtime or another shift. The line balancing calculator shows which stations are over takt.
Does takt time include efficiency or OEE?
Plain takt time does not; it is available time over demand. Some planners also multiply available time by availability and performance factors to plan for losses. Capacity Line does this: it applies each resource's availability factor and the calendar's performance factor, so its takt is shorter than plain takt whenever those factors are below 100%.
Is anything I enter saved?
No. The calculator runs in your browser and nothing you type is sent to AutoOps AI or stored. There is no login.