Free industrial engineering tools
Free calculators for the numbers industrial and manufacturing engineers work out every week. Each one updates as you type, shows its formula and a worked example, and runs in your browser with no login.
Line design and capacity
Set the pace a line has to keep, spread the work so every station can keep it, and size the machines it needs.
- Takt time calculatorHow often one unit has to leave the line to meet demand.
- Line balancing calculatorSpread tasks over as few stations as takt allows, and find the bottleneck.
- Machine requirement calculatorHow many machines a demand needs, and how loaded they will be.
- Yamazumi chart makerStack each station's work by type against takt, and see where the waste is.
Work measurement
Turn a time study into a standard, size a work sampling study, and plan how quickly a new job gets faster.
- Standard time calculatorFrom a time study to a standard, with rating and PF&D allowances.
- Work sampling calculatorHow many random observations a work sampling study needs.
- Learning curve calculatorHow fast a new job gets quicker, and when a ramp-up reaches its target time.
Flow and inventory
Size kanban loops and safety stock, and see how the work waiting in a process sets its lead time.
- Kanban calculatorHow many kanban cards a pull loop needs, from demand, lead time and container size.
- Safety stock calculatorSafety stock and the reorder point from demand and lead-time variation.
- Little's Law calculatorWIP = throughput × lead time: enter two, get the third.
Equipment and downtime
How much of the planned time a machine really produces, and how often and how long it stops.
- OEE calculatorAvailability × performance × quality: how much planned time made good parts.
- MTBF and MTTR calculatorHow often a machine breaks down, how long it stays down, and its availability.
Quality and problem solving
Which causes matter most, whether a process is stable, and whether it can hold the tolerance.
- Pareto chart makerPaste a column of reasons and see the few that cause most of the loss.
- Control chart calculatorp chart or I-MR chart, with control limits and the Western Electric rules.
- Process capability calculatorCp, Cpk, Pp and Ppk from your measurements and spec limits.
- DPMO calculatorDefects per million opportunities, yield and sigma level, with the 1.5σ shift spelled out.
- RPN calculatorSeverity × occurrence × detection for a list of failure modes, sorted.
Cost and payback
Put a dollar figure on stops and scrap from your own rates, and check whether a project to remove them pays back.
- Downtime cost calculatorHours down × (crew + machine rate), plus margin on output you can't make up.
- Scrap cost calculatorMaterial and processing lost on scrapped parts, less recovery, plus rework.
- Automation payback calculatorSimple payback, NPV and IRR for an automation or equipment project.
How these tools work
Every page states the formula it uses, works one example through with our own numbers, lists the mistakes that most often skew the answer, and answers the common questions. The formulas are the standard ones from industrial engineering and quality textbooks, written up in our own words. Under each result, "Show the working" lists every step with your numbers, so you can check the answer by hand.
The tools work on the numbers you type. If your plant is on an AutoOps AI plant account, you can also upload a production export to see each line's output, scrap and downtime against its own normal range.