Work sampling calculator
Work sampling sample size: n = z² × p × (1 − p) ÷ e². p is the share of time you expect the activity to take, e the accuracy you need, and z the normal value for your confidence level. Measuring a 25% idle share to within ± 4 percentage points at 95% confidence takes 451 random observations.
Size your work sampling study
Enter the share you expect, from a pilot study or a fair guess, the accuracy you need and your confidence level.
From a short pilot study
90, 95 or 99 are usual
To work out the days
- Days of study
- 12 days
- Accuracy
- ± 4 points
- z value
- 1.96
- Before rounding
- 450.2
Show the working
- z for 95% confidence (two-sided): 1.96.
- Accuracy: ± 4 percentage points, e = 0.04.
- Observations: 1.96² × 0.25 × 0.75 ÷ 0.04² = 450.17, rounded up to 451.
- Days: 451 ÷ 40 observations a day = 11.28, rounded up to 12.
- Once the study is done, recompute the share from the real counts and check the accuracy you achieved: e = z × √(p × (1 − p) ÷ n).
The work sampling formula
Work sampling estimates the share of time spent on an activity (running, idle, waiting, walking, setting up) from many short, random observations instead of continuous timing. Each observation records only what is happening at that instant. The share of observations in an activity estimates the share of time it takes, and the formula says how many observations make that estimate precise enough.
Absolute accuracy is in percentage points: ± 4 points on a 25% share means somewhere from 21% to 29%. Relative accuracy is a share of p itself: ± 10% of 25% is ± 2.5 points. For small shares, relative accuracy asks for far more observations, because a few points either way is a large error on a small number.
Confidence is how often a study run this way would land within the accuracy you chose. At 95%, about one study in twenty misses. z is two-sided because the estimate can miss high or low. The formula is the normal approximation to the binomial distribution, which works well when n × p and n × (1 − p) are both above about 10.
Worked example
A plant manager wants to know how much of the shift the receiving-dock forklift stands idle before buying a second one. A one-day pilot of 100 random walk-by observations found it idle in 25 of them. The manager wants the final figure within ± 4 percentage points at 95% confidence, and a team lead can make 40 random observations a day without disrupting the work.
- z for 95% confidence (two-sided): 1.96.
- Accuracy: ± 4 percentage points, e = 0.04.
- Observations: 1.96² × 0.25 × 0.75 ÷ 0.04² = 450.17, rounded up to 451.
- Days: 451 ÷ 40 observations a day = 11.28, rounded up to 12.
- Once the study is done, recompute the share from the real counts and check the accuracy you achieved: e = z × √(p × (1 − p) ÷ n).
Running the study
Random times matter more than the count. Draw the observation times from a random number generator, spread them over every shift and day of the week the study is meant to cover, and vary the route so nobody can predict when the observer will arrive. Define each category before you start, in words two observers would apply the same way, and record what you see at the moment you see it.
Halfway through, recompute p from the observations so far. If it has moved a long way from the pilot figure, rerun the calculator with the new p and extend the study. At the end, the share is a share of the time studied: a forklift idle 25% of the time is idle about two hours of an eight-hour shift. Figures like that settle whether a second machine is needed, whether a planned rate is realistic, or how big a delay allowance in a standard time should be.
Common mistakes
- Observing at fixed times. Rounds on the hour catch the same part of every cycle and every break pattern. The times must be random, or the shares are biased in a way the formula can't detect.
- Guessing p and never checking it. The number of observations depends on p. Run a short pilot first, and recompute n midway with the share you are actually seeing.
- Vague categories. If one observer calls a forklift waiting for a dock door idle and another calls it working, the shares mean nothing. Write each category down, with examples, before the first observation.
- Changing what you measure by watching. People work differently when they know they are being observed. Explain the study, observe from where the work is visible without hovering, and run it long enough to become routine.
- Mixing absolute and relative accuracy. ± 5% can mean ± 5 points or ± 5% of the share. On a 10% share at 95% confidence, that is the difference between 139 observations and 13,830. Say which one you mean.
Work sampling FAQ
What is work sampling?
A work measurement method that estimates how time is split between activities by recording what is happening at many random moments. If a machine is found idle in 113 of 451 random observations, it is idle about 25% of the time. It costs less than continuous timing and suits long, varied or group work.
How do you calculate the sample size for work sampling?
n = z² × p × (1 − p) ÷ e², where p is the expected share, e the absolute accuracy as a fraction, and z the normal value for your confidence level. For p = 25%, e = ± 4 points and 95% confidence: 1.96² × 0.25 × 0.75 ÷ 0.04² = 450.2, so 451 observations.
What is the difference between absolute and relative accuracy?
Absolute accuracy is in percentage points of the whole: ± 4 points. Relative accuracy is a share of the activity's own percentage: ± 10% of a 25% share is ± 2.5 points. For relative accuracy r, n = z² × (1 − p) ÷ (r² × p).
What if I don't know p yet?
Run a short pilot of 50 to 100 random observations and use its share. With no idea at all, p = 50% gives the largest n for a given absolute accuracy, so it is the safe choice.
When is work sampling better than a time study?
When the work is long or irregular, done by a group, or spread over a whole shift: equipment utilization, the share of time spent waiting or searching, the share of a job spent on set-up. For a short, repetitive cycle, a stopwatch time study gives a standard time directly.
Which confidence level should I use?
95% is the usual choice. Use 90% for a rough first look and 99% when a costly decision rests on the result. Higher confidence needs more observations for the same accuracy: 99% needs about 1.7 times as many as 95%.
Is anything I enter saved?
No. The calculator runs in your browser and nothing you type is sent to AutoOps AI or stored. There is no login.