Pareto chart maker
A Pareto chart sorts causes from largest to smallest and adds a running total, so the few causes behind most of a loss stand out. Paste a column of downtime or scrap reasons, one per line, with or without a count, minutes or cost after each. The chart builds as you type.
Make your Pareto chart
One reason per line. To add minutes, counts or costs, put the number after a comma or a tab, as in "Film jam, 210". Lines with the same reason are added together.
Paste a column straight from a spreadsheet, up to 5,000 lines. Numbers without thousands separators.
The first 3 of 7 reasons make up 80.2% of the total. Start with Film jam: 38.2% on its own.
- Vital few: share of total
- Other reasons: share of total
- Cumulative share
- 80%
| Reason | Total | Share | Cumulative |
|---|---|---|---|
| Film jam | 210 | 38.2% | 38.2% |
| Changeover overrun | 135 | 24.5% | 62.7% |
| Waiting for material | 96 | 17.5% | 80.2% |
| Sensor fault | 44 | 8% | 88.2% |
| Label misfeed | 31 | 5.6% | 93.8% |
| Operator called away | 19 | 3.5% | 97.3% |
| Other | 15 | 2.7% | 100% |
Show the working
- Read 7 lines into 7 reasons, adding up the number on each line (a line with no number counts as 1).
- Total: 550.
- Sorted largest first, with Other last: Film jam 210, Changeover overrun 135, Waiting for material 96, Sensor fault 44, Label misfeed 31, Operator called away 19, Other 15.
- Running total as a share of 550: 38.2%, 62.7%, 80.2%, 88.2%, 93.8%, 97.3%, 100%.
- The first 3 of 7 reasons make up 80.2% of the total: Film jam, Changeover overrun, Waiting for material.
How the chart is built
The bars use the left axis (the totals) and the line uses the right axis (cumulative percent). Reasons are matched ignoring capital letters and extra spaces, so "Film jam" and "film jam" count together. A reason called Other is always drawn last, whatever its size, because it is a mix of causes rather than one.
Worked example
A packaging line logged 550 minutes of unplanned downtime in one week under seven reason codes. The minutes per reason, in the order the log listed them, were pasted in as "reason, minutes" lines.
- Read 7 lines into 7 reasons, adding up the number on each line (a line with no number counts as 1).
- Total: 550.
- Sorted largest first, with Other last: Film jam 210, Changeover overrun 135, Waiting for material 96, Sensor fault 44, Label misfeed 31, Operator called away 19, Other 15.
- Running total as a share of 550: 38.2%, 62.7%, 80.2%, 88.2%, 93.8%, 97.3%, 100%.
- The first 3 of 7 reasons make up 80.2% of the total: Film jam, Changeover overrun, Waiting for material.
Common mistakes
- Counting events when minutes or dollars matter. Twenty one-minute jams and two two-hour breakdowns rank very differently by count and by time. Rank downtime by minutes and scrap by cost when you want the chart to say where the loss is.
- Reason codes that are too broad or too narrow. "Mechanical" hides the cause in one big bar; forty codes for the same jam split it into small ones. Merge or split codes until each bar is one thing a team could act on.
- A large Other bar. If Other is bigger than the third or fourth reason, too many stops were logged without a proper reason. Fix the coding before drawing conclusions from the rest.
- Treating 80/20 as a law. The split is rarely exactly 80/20, and sometimes the losses are spread evenly. The point of the chart is the ranking: start with the top bar, not with the reason that is easiest to fix.
Pareto chart FAQ
What is a Pareto chart?
A bar chart of causes sorted from largest to smallest, with a line showing the cumulative percentage of the total. It shows which few causes account for most of a problem, so improvement work starts where it matters most.
How do I make a Pareto chart?
Total each cause (count, minutes or cost), sort from largest to smallest, put Other last, and divide each running total by the grand total to get the cumulative percentage. Then draw the totals as bars and the cumulative percentage as a line. This tool does all of it from a pasted list.
What is the 80/20 rule?
The Pareto principle: in many problems, roughly 80% of the effect comes from roughly 20% of the causes. It is an observation, not a law, and the real split varies. The chart shows the actual split for your data.
Can I paste minutes or costs instead of single events?
Yes. Put the number after the reason, separated by a comma or a tab, such as "Film jam, 210". Lines with the same reason are added together. A line with no number counts as one occurrence. Use numbers without thousands separators.
Is anything I enter saved?
No. The calculator runs in your browser and nothing you type is sent to AutoOps AI or stored. There is no login.